Appendix I: Incident Response Plan (IRP)
This needs work that may have been completed elsewhere and nees to be moved into here.
This needs MVP and Normalized content examples
MVP Key Points Include:
- The IR-8 (
id=ir-8control should havelinksentries to the RoB
This is not normalized and is only for legacy conversion MVP
Normalized Key points include:
- attach the IRP as a back-matter/
resourcesentry - create a component for the IRP
- From the componet, add a
linksentry that references theresource(#uuid-value)
- From the componet, add a
- The IR-8 control has
by-componentsentrys that cite the IRP component
Reference Components [need citation - there may be a page for document-type compnents ] and Attachments pages. Don't duplicate those explanations here.
No comments to display
No comments to display